Obtain a building plan / planning permit (state)
Get a planning permit before building. In Lagos the permit is issued by LASPPPA under the Physical Planning Permit Regulations 2019: land title & survey → architectural and engineering drawings → submission and assessment → processing fee → permit within 28 days; construction is then supervised by LASBCA.
- Procedure
- 4steps
- Coordination
- 4agencies
- Category
- Land & premisesConstruction
Task links
Go to the exact next page
Application, requirements, forms, fees, and tracking are labelled separately.
Apply onlineOpen the Lagos planning-permit portalLagos State Government · epp.lagosstate.gov.ngLagos example — planning permission is administered by each state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsCheck the planning-permit document listLagos State Government · epp.lagosstate.gov.ngLagos example; requirements vary by development type and state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsRead the Lagos planning regulations (PDF)LASPPPA · epp.lagosstate.gov.ng⚠ we could not reach this source from outside Nigeria — it may still work for you↗
Routing map
Who you will deal with
State Lands Bureau / registered surveyorRegistered architect and engineersLagos State Physical Planning Permit Authority (LASPPPA) / state planning authorityLASPPPA; LASBCA
Procedure
The steps, in order
Each route below is scoped to the step it can actually complete.
01 Secure land title and survey
- Agency
- State Lands Bureau / registered surveyor
- What is required
- Establish a registered title (C of O or perfected assignment) and a survey plan for the site. Planning permits are refused without evidence of title and an approved survey.
- Documents
- Title document; survey plan
- Typical timeline
- Precondition
Use for this stepRequirementsCheck the planning-permit document listLagos State Government · epp.lagosstate.gov.ngLagos example; requirements vary by development type and state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsRead the Lagos planning regulations (PDF)LASPPPA · epp.lagosstate.gov.ng⚠ we could not reach this source from outside Nigeria — it may still work for you↗02 Prepare drawings to code
- Agency
- Registered architect and engineers
- What is required
- Prepare architectural drawings, structural and services drawings, and (for larger schemes) soil investigation and structural stability reports, in compliance with the Operative Development Plans, state planning standards and the National Building Code.
- Documents
- Architectural, structural and services drawings; stability report
- Typical timeline
- Design stage
Use for this stepRequirementsCheck the planning-permit document listLagos State Government · epp.lagosstate.gov.ngLagos example; requirements vary by development type and state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsRead the Lagos planning regulations (PDF)LASPPPA · epp.lagosstate.gov.ng⚠ we could not reach this source from outside Nigeria — it may still work for you↗03 Submit, assess and pay the processing fee
- Agency
- Lagos State Physical Planning Permit Authority (LASPPPA) / state planning authority
- What is required
- Submit on the e-Planning Permit portal or at the district office. The processing fee = FEE 1 (building plan assessment: building volume L x B x H x zone rate) + FEE 2 (fencing fees, layout ₦100,000, registration ₦50,000, and LPO at 10% of the building assessment). Payment via the Lagos State payment portal.
- Documents
- Application; drawings; assessed processing fee
- Typical timeline
- Assessment
Use for this stepApply onlineOpen the Lagos planning-permit portalLagos State Government · epp.lagosstate.gov.ngLagos example — planning permission is administered by each state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsCheck the planning-permit document listLagos State Government · epp.lagosstate.gov.ngLagos example; requirements vary by development type and state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsRead the Lagos planning regulations (PDF)LASPPPA · epp.lagosstate.gov.ng⚠ we could not reach this source from outside Nigeria — it may still work for you↗04 Permit issuance and construction oversight
- Agency
- LASPPPA; LASBCA
- What is required
- Applications are processed and approved within 28 days after final screening and payment of the permit processing fee. Collect the stamped approval, then register with the Lagos State Building Control Agency (LASBCA), which supervises construction stage by stage.
- Documents
- Stamped planning permit; LASBCA registration
- Typical timeline
- Within 28 days
Use for this stepApply onlineOpen the Lagos planning-permit portalLagos State Government · epp.lagosstate.gov.ngLagos example — planning permission is administered by each state.⚠ we could not reach this source from outside Nigeria — it may still work for you↗RequirementsRead the Lagos planning regulations (PDF)LASPPPA · epp.lagosstate.gov.ng⚠ we could not reach this source from outside Nigeria — it may still work for you↗