Obtain a filling-station (retail outlet) licence

License a petrol filling station with NMDPRA under the PIA 2021: site suitability → Approval to Construct → build + witnessed tank test → storage & retail outlet licence.

Procedure
4steps
Coordination
2agencies
Category
Sector licencesEnergy
Task links

Go to the exact next page

Application, requirements, forms, fees, and tracking are labelled separately.

Routing map

Who you will deal with

NMDPRANMDPRA / NUPRC
Procedure

The steps, in order

Each route below is scoped to the step it can actually complete.

  1. 01

    Apply for site suitability inspection

    Agency
    NMDPRA
    What is required
    Apply to NMDPRA for a site suitability inspection. Siting rules: pump ≥15 m from the road edge; ≥400 m between stations; ≤4 stations per 2 km stretch of road.
    Documents
    Site details; land documents; application (celps.nmdpra.gov.ng)
    Typical timeline
    Inspection stage
  2. 02

    Obtain Approval to Construct (ATC)

    Agency
    NMDPRA
    What is required
    On a favourable suitability report, submit documents for review; NMDPRA issues the Approval to Construct.
    Documents
    Suitability report; engineering drawings; submitted documents
    Typical timeline
    After review
  3. 03

    Construct and pass witnessed tank tests

    Agency
    NMDPRA / NUPRC
    What is required
    Build the station (minimum 3 underground tanks and 3 pumps for PMS, DPK, AGO). NUPRC witnesses tank burial and the pressure/leak test.
    Documents
    Constructed facility; tank test
    Typical timeline
    Construction period
  4. 04

    Obtain the storage & retail outlet licence

    Agency
    NMDPRA
    What is required
    Apply for the licence to store and sell petroleum products and operate the station. Licence fee ₦2,000,000.
    Documents
    ATC; completed & tested facility; fee payment
    Typical timeline
    ~4-8 weeks from complete submission